Semi auto glass loading machine by environmental temperature, dust, vibration and impact of internal components aging equipment, there may be some potential problems in the operation process, to enable the device to use long-term, stable, it is necessary to carry out daily and regular maintenance of equipment and maintenance.
7.1 electrical box maintenance
1 electrical box remain closed state under normal conditions;
2 keep the electrical box clean;
3 electrical box not water;
Unplug the electrical box internal check, 4 per month, see the inside of the thread is loose, the components are loose, the timely locking.
7.2 double arm drive maintenance
Turbine worm mechanism is a important part of the function of the machine, regularly on the worm body maintenance, to improve equipment utilization rate. Maintenance of equipment are as follows:
1) daily inspection and maintenance: institution work whether there is abnormal sound? A foreign body is a worm surface? Whether the vibration movement;
The 7.3 air source treatment components maintenance
On air source treatment components to maintain a few points:
1) emissions filtration pressure regulating valve components are filtered out of the water;
2) cup will air source treatment components of each month with a 32# machine oil.
Note: maintenance and replacement of all parts must use original parts, before the maintenance and inspection make sure the power is off, the reducer has cooled, otherwise it will cause harm to human body!
Maintain the 7.4 vacuum pump
For the maintenance of the vacuum pump, according to the need for maintaining the following field use:
1) daily inspection and maintenance: when the vacuum pump works whether there is abnormal sound? Whether there is a significant vibration at work;
2) the oil level regularly check the vacuum pump, when the oil level is low need to refuel. Refueling please vacuum pump oil special filling the pump;
3) according to the field application test vacuum gas pipelines, such as found in the use of vacuum suction time;
4) vacuum pump replaced once a year.
Other maintenance 7.5 piece
1) double arm bearings at both ends, walking driving wheel, bearing, at both ends of the driven wheel breaking activities rod, a universal wheel, a directional wheel and related activities component 1 and a half months plus a butter;
Table 2) felt after use clean once every day;
3) remote controller battery replaced every 6 months;
4) thermal relay reset button reset every two months;
5) electrical control box terminal examination every 6 months (remember to turn off the total power supply);
6) equipment in use process, if found floating effect decreases, can be properly according to the total height table adjustment;
7) the sucker in the groove as found in a glass or other impurities should be cleaned immediately;
8) double arm four connecting rod locking sleeve inspection once every 3 months, to prevent
9) regular inspection table are blocked pores phenomenon;
10) fan base screw, walking motor and reducer docking Luo screws 6 months to recheck once.